Showing posts with label Filming. Show all posts
Showing posts with label Filming. Show all posts

Monday, 28 October 2013

Instruments for music video.

In preparation for the filming date on wednesday I have been organising a number of things. First of all I have sourced the instruments needed in our music video (helped by my dad being in a band). The following Drum, Amplifier, Electric guitar and microphone will feature in our performance music video. 







FILMING LOCATION FILMING LOCATION FILMING LOCATION



... We have finally secured a location to film our Fictitious music video! We will be filming between 9 am and 5 pm on Wednesday the 30th of October at the Yellow Bean Studios in Leicester. The "SPACIOUS 26 X 15 FT STUDIO  IS SITUATED JUST OFF NARBOROUGH ROAD EQUIPPED WITH WHITE CURVED “INFINITY” WALL STUDIO AREA, HI GLIDE, DRESSING ROOM, SEATING AREA, WI-FI, AND KITCHEN/TOILET."